Overview
A constructed wetland wastewater treatment facility was originally built for Ochlocknee, a rural town of less than 1,000 population as a low operational cost and minimum maintenance solution. An expansion was needed to increase the permit capacity of the treatment from 15,000 gpd to 50,000 gpd as the number of sewer connections increased over the years.


Project Summary
● Facultative stabilization pond
● Two wetland cells in series on a parallel system
● Two wetland cells in series on a parallel system
● Common cattails and Sawgrass were planted to aid in transferring of oxygen to the root zone
Services Provided
● Application and Engineering Report for funding (GEFA & CDBG)
● EID (Environmental Information Document)
● DDR (Design Development Report)
● Surveying
● Permitting services
● Easements
● Design services
● Cost estimating
● Contract documents
● Bidding assistance
● Construction administration & monitoring
● EID (Environmental Information Document)
● DDR (Design Development Report)
● Surveying
● Permitting services
● Easements
● Design services
● Cost estimating
● Contract documents
● Bidding assistance
● Construction administration & monitoring